Monday, December 2, 2024
Login
Email
Toggle navigation
Projects
Current
All Current Projects
TEHRAN Metro (Line 1)
TEHRAN Metro (Line 3)
TEHRAN Metro (Line 6)
KARAJ Metro (Line 2)
ISFAHAN Metro (Line 2)
SHIRAZ Metro (Line 2)
Road
Other
LINE 10 METRO OF TEHRAN
Completed
All Completed Projects
TEHRAN Metro (Line 1)
TEHRAN Metro (Line 3)
TEHRAN Metro (Line 4)
TEHRAN Metro (Line 6)
TEHRAN Metro (Line 7)
KARAJ Metro (Line 2)
ISFAHAN Metro (Line 2)
TABRIZ Metro (Line 2)
SHIRAZ Metro (Line 2)
MASHHAD Metro (Line 2)
TEHRAN-KARAJ Railway line
MARAGHEH-URMIA Railway line
ZAHEDAN Railway Station
HASHTGERD Metro Station
MEHRSHAHR Dopt
Road
Other
Events & Announcements
Articles & publications
About us
Introduction
Board of Directors
Chart
Key Personel
Certificates
Contact us
Main page
/
Completed Projects
/
Shiraz tram studies (phase 1)
Shiraz tram studies (phase 1)
1398/03/01
Road
Tags:
Projects time line
March 2023
LINE 10 METRO OF TEHRAN, TEHRAN, IRAN (L10-TM)
Jul 2022
REHABILITATION OF KARASF-SOHREVARD ROAD, ZANJAN, IRAN (KSR-Z)
1398/03/01
Shiraz tram studies (phase 1)
July, 2009
Studies of first stage of the split level intersection of Rey beltway with Fadaiyan Islam, Shahid Ghayouri and Ibn Babuieh Avenues
February, 2007
Studies and design of first phase of Neyshabour bypass highway
August, 1999
phase one studies of split level intersection at Mardabad street – Karaj highway
August, 1999
Phase two design of the extention of Tehran-Karaj-Mehrshahr railway to Hashtgerd
September, 1998
Surveying of Mehrshahr – Hashtgerd railway project
×
خطا!
کمی منتظر بمانید...